Showing posts with label in progress. Show all posts
Showing posts with label in progress. Show all posts

Wednesday, July 22, 2009

Socks and a sweater

Not finished ones though. Yet.

Socks first. Nine Tailors Socks After a fairly lengthy discussion over at Ravelry, especially message 28, with TsockTsarina about doing these toe-up, I'm doing them cuff-down as written. Mostly. I'm doing them cuff-down starting just after the ribbing, (provisional cast-on) and then doing the ribbing upwards which will give some leeway to adjust for fit.

Most of the sock details I understand how to reverse them to toe-up, but the one thing that she pointed out was that as written, the cable starts at the ribbing and goes down. If you (I) work them toe-up, you don't know where to start the cable (at the toe) so that the cable ends at the ribbing at same beginning point.

On one hand, if the cable doesn't end at the same point, it doesn't matter, because both socks will match.

On the other hand, the cable is a bell-ringing 'song' (chant, verse, whatever) so it won't be starting at the beginning.

Sweater

I've been thinking about the Sort Of Thora (last update) sweater that's been hanging around for, um, 3 or 4 years. Besides the fitting issues from the last time (which, I'm guessing haven't changed), a fewer bigger 'problems' have come up.

Warmth - I don't really need a worsted weight 100% wool heavy sweater. It'll be too hot to wear indoors, and probably not jacket-y enough to wear outdoors. I think the cable design will get obscured the first time the sweater's washed. I found a small swatch I had done a long time ago (no notes, so I don't know if there was any shrinkage) and the knit stitches were all fuzzy and blended together. Ok for a simple pattern, but not ok for a cable. It's a dressy cardigan that's been dressed-down. The dressed-down part is ok, but... I still have that picture of the dressy cardigan in my head. And the Sort-of Thora is ok, but sort of a let down. I think it's the yarn (a casual, soft, tweedy purple) more than the re-sizing and top-down vs bottom-up etc changes I've done. A different yarn, maybe a jewel tone with a little more body to it, would work better.

I think this is going to be ripped and re-knit (or crocheted?) into something casual. Maybe. Or maybe not.

Saturday, July 11, 2009

Project updates

I started working on the Nine Tailors Socks. I did a short-row toe and started the mini-cable panel on the foot. There's a little more than 4" done, it's not as complicated as it looks, although the leg has two mini-cable panels and two colorwork panels. I think I'm going to be ripping most of it out though - I didn't short-row enough so the end of the toe is a little too wide. And re-doing it will let me neaten up the start of the mini-cable, so that's good too. Haven't decided on the heel yet, but I have time before I get to the gusset. Or maybe not, if I don't rip out, I'm only 2" or so away from the gusset/heel. This is going faster than I expected.

Other projects -

Regia Cotton Socks - I turned the heel of the first sock and I'm leaving it as all-stockinette with a picot hem. Slow knitting - but only because I'm not working on them much.

Barbara Seamen's Scarf by Myrna Stahman in a wool/alpaca mix. Done. And mailed off for a Craftster swap. I did switch to 14" straights, it was easier to keep the 2 halves of the scarf together than it was with the cable of the flex needle. The other half slid down the cable and made the needle feel lopsided. Didn't happen with the straights. Just over 60" long and about 10" wide. I think I'll be making one for myself in a different pattern. The ribbed neck and wide tails was a nice combination.

Friday, June 26, 2009

More progress notes

Not sure what happened to May, but June just disappeared. A few days prepping for vacation. Almost 2 weeks on vacation. Three days for a family reunion-y weekend get-together. Four days of either me being sick or hubby in the hospital. I'd like to re-do this last week without being sick or seeing the inside of a hospital.

Anyway... project 'stuff'

The next-in-line stuff (first because it's more interesting)

The Nine Tailors Socks from Tsockarina. Definitely next up when the scarf's done (but only because I think the scarf will be done before the Regia socks and those are the only two that will be done in the few weeks.) I bought the kit at the New Hampshire Sheep & Wool show this year. I read through the instructions and got stuck at the line that said something like "because of the toe pattern, these can't be knit toe-up" (not an exact quote because the pattern's in the other room and I'm too lazy to go get it). So of course, I spent a while thinking about how to knit them toe-up. Because I really don't like knitting tall socks top-down - and from the sample at NHS&W these are taller than what I usually knit.

So I wound the yarn while I considered this. I think that will be the worse of the pattern. I hand-wind skeins into balls all the time. I have to, I don't have a ball-winder. I untie the skeins, shake them a little to loosen them, lay them over my knees, or over the newel post of the staircase, and wind. 100gm is about 30 minutes or so. No big deal. Until I started. Took about 2 1/2 hours. The skein wasn't knotted or tangled or anything like that, but the strand went *under&over itself, reversed direction, then repeat from * for the whole 100gm. Weird. And slow.

And I made row counters. Once I figured how the bell ringing notation was written out (it took a few re-reads of the instructions) it'll be easier for me to knit from that instead of the chart or the written instruction.

Toe-up. Definitely being done toe-up.

The active stuff -

Regia Cotton Socks - I finished the foot of one sock in the hospital. I'm thinking they'll be all-stockinette with a picot hem. I like the self-striping pattern that's showing up.

Regia Ski Socks - They've been found. That's all.

Barbara Seamen's Scarf by Myrna Stahman in a wool/alpaca mix. Very soft. Amazingly bulky compared to the socks (size 0 vs size 9 needles) I've finished the ribbing section and I'm doing the tails at the same time. I've been using flex needles, but I may try regular 14" straights instead.

Done stuff

Easy Peasy 2 Swap - Crocheted Robot finished & sent & pic here (posted by receiver).

UFO stuff

Sort-of Thora Sweater (last update) Absolutely no progress, except to entertain thoughts of frogging it and saying to hell with it. Then I get a good night's sleep and decide maybe it's worth finishing.

Socks to Anklewarmers - no progress, but hanging around.

Saturday, May 02, 2009

In progress notes

Regia Cotton Socks - I just these a few days ago. I think they're a regia yarn, but without a label, I'm just guessing based on the self-striping pattern. I suppose they could be Meilenweit or Fortissima too. I started with toe-up using the wide-toe cast on from Priscilla Gibson Robert's book Ethnic Socks and Stockings book. The foot will be (probably) be stockinette, haven't decided on the heel or leg pattern yet.

Regia Ski Socks
- ???? I know I knit on them on vacation. I know they were too small (they can only stretch so far...) I know they made it home from vacation. I know where the extra balls of yarns are. I don't know where the socks are.

Easy Peasy 2 Swap - Not started yet

Sort-of Thora Sweater (last update) Absolutely no progress since the last update. I tried it on and it's not right - a little short (but that's easy enough to fix) and a tighter than I wanted (not as easy to fix). Even sleeveless, the sweater (vest) was warmer than I expected it to be. Not really a bad thing since I want to wear it almost as a light jacket. But the V-neck isn't quite right. This cabled sweater is close in style to what the Sort-of Thora sweater is turning out to be.

So... to fix the width, I can add some panels to the side seams. Easy enough. But the V-neck still won't be right. I'd have to rip out both fronts and re-do the neck & front cabling again.

The V-neck isn't right because the sweater's tighter than I want. Before I rip back I'm going to undo the side seams and see if I can tell what the V-neck would look like if the sweater was the right size. Then I can rip-back if I have to.

Socks to Anklewarmers - no progress

Saturday, July 26, 2008

Half done

Really.

I've got half a baby sweater:


(white with green/yellow/blue) The ruffled edge is the center back. It'll get kitchenered to the other side. It's the Cottage Creations Babies&Bear sweater - two pieces knit cuff to center and grafted together.


And I finished spinning the singles for the Tour De Fleece 2008 . That's half done, since it still needs to be plyed tonight.



And, not half done, even though I don't usually do Saturday Sky, it's the first day all week it hasn't been thundering rain so -




Saturday, May 31, 2008

Project list

Just thinking out loud -

I finished spinning the clown face merino and I think (now, subject to change) that I w ill ply it. It'll blend the colors a bit more into a tweedy-no-dominant-color yarn. After that, I'm not sure. Probably a shawl. But that's a later decision.

I started the 2nd Lang Jawoll sock. I stopped the first one at anklet height because I didn't want to do anymore on it. The second sock is just started, I'm beyond the toe and just started the helix knitting. Don't like working on this one either and I still don't know why. I like the colors, the fit, the yarn, but I just don't like it.

I really want to get the Thora sweater (sweater 2 talked about here - very little progress since then) done before the fall. I don't think there's a whole lot left to do, but it's been stuffed in a tote bag since um, well, the last time I worked on it. Maybe I'll do it as a Summer Knitting Olympics project. (apologies to non-Ravelry members, I couldn't find a link outside of Ravelry. It's along the same idea as the Winter Knitting Olympics)

I have a bunch of small UFO projects - the kind of project that if I really work on them (instead of saying "oh yeah, I should finish that") would be done in about 4 hours. Ok, one, or 2, of them might take 10hours. But either way, small. I'd like to finish those up in June. For no reason other than I'm tired of saying "oh yeah, I should finish that"

I have 1oz each (about 300yds each) of 2 different colors of Zephyr lace weight (peacock and jade, I think) They look well together, with both strands held together to make a fingering weight. Not so good as two separate yarns in the same project. I'm thinking of some sort of small scarf or maybe a really lacy longer scarf/stole or ? I got the yarn a few years ago as a sock kit, but the yarn seems too 'soft' for socks.

Possible project schedule -
June -
finish small UFOs (step 1 - find them & make sure I have the instructions etc to actually do them)
finish second Lang Jawoll sock
decide on 12 tawashi patterns for a Craftster swap and start making them

July
finish the tawashi
work on the Thora sweater

August
finish the Thora sweater

and somewhere in there, ply the clown face merino, decide on a pattern for the Zephyr laceweight, and do other as-yet-undetermined things.


Type your summary here

Type rest of the post here


Sunday, May 04, 2008

Sock in progress

I'm about 2" past the heel on my Lang Jawoll sock, and I'm not sure I like it -



I like the colors, so that's not the problem. (The colors in the next picture are closer to real life) The stripes on the foot are narrow because I did 'helix knitting' where I did one row from each end of the yarn ball. You can see the difference on the foot and after the heel -


I did the heel with just one strand of yarn and I'm doing the leg with just one strand. It's too annoying to have 2 strands going at once.

I did the heel differently than I usually do. The gusset increases start at the center bottom of the heel (started when the foot length was about 2" shorter than the finished foot length) I kept increasing until the foot length was the right length then I did a 'normal' heel turn, then started the leg.



The heel looks like a little pocket but I think it's just the way I folded the sock so it would lay flat for the picture. It fits well.

The toe was just a figure-8 cast-on (36 stitches total, but that's a little wide, the second sock will just be 32) and then increased 4 st every other row until the toe was wide enough. It's neat, and easy, but I think I like Priscilla Gibson-Roberts "wide toe" better.


I'm not sure if I'm going to keep doing the leg in plain stockinette or not. Heartstrings Fiberarts has a nice cabled variegated sock here. Maybe I'll try doing a simple cable. Or maybe try a spiral 'rib' like Lucy Neatby's Mermaid Socks (it's the top right sock on the book cover). There's about 5" left to do on the leg and I still have a second one to do.

And I have no idea why I don't like how these are coming out.

Sunday, March 16, 2008

Random Sunday

yeah, I know it's usually Random Wednesday, but I missed it on Wednesday :) (I got to find little smiley icons)

My PC crashed a week or so ago. We managed to get an old PC (running win 95) hooked up, but wow is this thing slow. And no USB connection, so no pics. And slow. Did I mention that? DH is going nuts with it too so I think a new PC is VERY close.

I'm making a bunch of tawashi (Japanese style scrubbies in acrylic yarn) for a craftster swap - and then I'm making some for me!

I found the beaded purse I'm knitting. I think that'll be the next on-the-go project once I finish the socks I just started. The socks are a Lang Jawall faux fair isle pattern. Nice colors, nice yarn. But it's going to a boring stockinette sock to knit - and I've only finished the toe, it's got a long way to go still. I need to find a simple, very simple, design that'll mix up the colors a bit. The Socks, socks, socks, book has a 'fake flame' sock pattern that I might try. And the Inerweave Knits Favorite Socks books has an interesting Japanese rib pattern that might look good, but I'm not sure yet if it's simple to knit or not. Or I'll go through some patterns I've printed out and see what I've got. An entrelac sock is possible, but entrelac is a bit fussier than I want. Feather & fan is simple, but I've already got one pair of F&F socks, I'm not sure I want do a 2nd pair.

I'm going to hang out on the couch today. I twisted my ankle last night, I don't think it's sprained (no swelling, I can walk on it but it hurts) but resting it and icing it isn't a bad idea. And I get make a few more tawashi too.



I do like the swaps on craftster, and I think the teens/early20's girls (I suppose there's guys too, just haven't noticed them) are lucky to have someone around - even if it's not 'real' life to share the crafty stuff. I would've loved to have someone crafty to talk to about projects etc then. Well, now too, but I've got craftster too (and a few 'real life' people too)

Tuesday, January 15, 2008

Long time, no talk! (or type or whatever)

Wow, I didn't realize how long it's been.

- My purple sweater - no real progress, I finished most of the body though, just have the front buttonbands to do. The buttonbands & body have different row gauges so I'm trying to work out the best looking way to attach them (preferably while I knit the bands, if not, I'll just sew them together)

- I have a couple of preemie hat patterns I want to post, but first I need to find my notes. And maybe re-knit them to get pictures, I've already donated the ones I just finished.

- I got a lovely shawl pin from Ruby Vegas designs

- I got a set of stitch markers, row counter, inc/dec counter from Hide And Sheep (I want more!)

- My spinning wheel is back. The problem was with the vendor, not the wheel, the Fricke wheel is great, the vendor, well, no comment.

- I've gotten interested in the swaps over at Craftster. It's a new thing for me to make things for people who really appreciate it.

- I'm almost done with the second Rainbow sock from the Oct (Nov?) magknits. It's borderline for a good on-the-go project. The size is right, but the constant (changing stitch count of the) short rows need more attention that I usually want for an on-the-go project. Maybe another 6 hours or so.

- I got the Jan/Feb issue of Piecework magazine with the Rovaniemi mittens technique article. I read it and I still don't see the "secret" why it's different than 'normal' colorwork. I need to try it out and see.

Sunday, December 02, 2007

Tale of 2 sweaters

Sweater 1 is the baby sweater I finished a couple of weeks ago. The shower was today, and while the baby sweater set (sweater, booties, mittens, and hat) wasn't the fanciest gift and certainly not the priciest, I think it was #1 based on the number of "OOOHHHH!!!!!"s it got when opened.

Sweater 2 is the semi-Thora, semi-gansey, semi-I-don't-know-what sweater that's been on the needles since forever.

Some (not-so) minor frogging occurred last week when I frogged both sleeves. They were too tight because I messed up the decreases (right decreases but calculated for the wrong length).

I went away for a long weekend, and I took the sweater as my vacation knitting (4 days away counts as a vacation, right?) figuring if that's the only thing to knit, I'll actually knit on the sweater and make some progress.

I had decided a while ago not to continue the cabling/moss stitch beyond the yoke area. I also realized that I didn't need a worsted weight sweater knit on size 6 (4mm) at 6spi. So using the idea from the 1930's 3-hour sweater I swatched a little (very little) and picked size 9 (5.5mm) needles to work the rest of body in plain stockinette at 4spi.

I finished both fronts, except for the butttonbands, and I'm about 3" away from finishing the back. All that's left is the buttonbands, the last 3" of the back, and the sleeves, and sewing up the side/underarm seams.

Definite progress.

Sunday, November 25, 2007

Now that the baby stuff knitting is almost done - just one pair of booties (about 2hrs) and maybe one more mitten (for a "pair & a spare" if I have enough yarn left), I can think about other projects.

Already in progress -
A long, long, long, in progress sweater for me. It's probably 3 years in the making. I like the color (Cascade 220 Quatro color #9437 purple) and the design so far looks ok. The heathery color is working up to a more casual sweater than I'd originally planned, so I'm making changes on the go. The sleeves are done, but too tight, so they need to be frogged & reknit (I miscalculated the decrease rated so there's too many decreases.) I haven't decided if it's a good thing that both sleeves match. Luckily the sweater's being done top down and I haven't joined front & back yet, because I've gained some weight since I started the sweater and need to make it a bit wider around to fit (which may have something to do with the sleeves being tight too).

Magknits Rainbow Socks - one done, just need the second one. This is the first time I can remember that I didn't do the second sock right away. The only reason for that is the baby knitting took over. I think I'll have to cast on and have the toe half done (or better) today so I can work on them tomorrow at the dr's office. I expect a wait there.

Fabric Shopping Tote - It's just about 1/2 done, just needs one side seam sewn up I think. It's a good TV project since it requires about zero attention. It can't be a show I need to look at though since I can't sew by feel.

I know I have a few other in-progress things that are slipping my mind - I remember a beaded purse on size 000 needles (I need to actually FIND it...) and some spinning and probably a few other things.

Projects I'm considering starting...

A few sewn zipper pouches like this or this.
A petal pouch in shades of purple.
The shaped shawl from the KnitSimple Holiday 2007 issue.
A few of the hats in the same issue.
A scarf or two from the Knitting New Scarves book
A crocheted lace kippah.
Preemie size gowns, hats, blankets.
A scribble lace scarf/shawl using handspun navy laceweight and a hot pink/navy HipHop yarn (step 1- spin the navy laceweight).
Figure out what to do with Glace (?) ribbon yarn and Optik yarn in stash.

Friday, November 23, 2007

Baby stuff

Knitting a baby set is the main fibery project around here right now -

Sweater -



I finished the Garter & Honeycomb Stitch sweater from the Greeting From the Knit Cafe book. Easy enough to knit, I did 2 things differently from the pattern was to use waste yarn for the armhole openings (instead of casting off then on the armhole stitches) and I did both straps together at the end.

Using the waste yarn meant the sleeves had to be done in the round, in a way, that's not a bad thing because it meant the only seams were the top of the shoulders between the armhole and the neck, instead of neck to wrist. On the other hand, doing the Honeycomb Stitch in the round meant being REALLY careful not to change tension on the slip rows - which I didn't do well on the first sleeve, but had it ok on the second sleeve.

Here's the sweater laid out, as best as possible, the way it's knit - you start with 6 stitches and knit the flap (left side of pic) increase for one side of the cross-over, then the rest of the sweater, decrease for the other side of the cross-over (the slit is where the cross-over fits into) and do another strap (on the right side of the pic, right where the pic ends, iow, no pic of the 2nd strap)


Doing the straps together at the end was simply because when I started I wasn't sure I had enough yarn. I did a provisional cast on for 6 stitches and did the last 2 rows of the first strap, then the sweater, then 2 rows of the 2nd strap - at that point I knew I had enough yarn to do both straps in the same yarn. (Or if I had run short, at least both straps would match) One thing that hadn't occurred to me when I started was that by doing both straps at the same time, the ends would match since they're both cast-off ends. Next time, I'll follow the order of the pattern, and just cast-on with a crochet cast-on that looks like a bind off chain edge (and the chain of a slipped-stitch selvedge).

I also was careful to do a slip-stitch selvedge on the edges that would show and a garter-stitch selvedge for the edges that were part of the shoulder seam. The schematic of the sweater was clear enough that it was easy to figure that out. It's a tiny detail that I'm positive no one would ever noticed, but I like having all the visible selvedges match. I don't always manage to, but I try.

Booties, Mittens, and hat continued...


Booties -
I'm doing these and they are really quick & easy. One takes about 45 minutes. I finished one pair, and I'm planning to make another pair. The only thing I'm going to change on the 2nd pair is to start from the top - do the same pattern, just start with the ribbing and end with the garter sole. That way the starting tail is at the top, and the ending tail is at the toe (well not really, since one or the other will be used to sew up the seam, but one's at each end). The way the pattern's written, the starting yarn tail is at the back heel and the ending yarn tail is at the top. I also did a double centered decrease instead of the 2 decreases 1 stitch apart, it made a nice line in the top of the foot, I don't think I can replicate that knitting top down with a double increase, but that's ok. A little variation is a good thing.

Mittens -
I used the baby mittens from the baby set in the Homespun, Handknit book. Another quick knit - I think an hour, including sewing up the seam. The top of the mitten is garter stitch and I wanted to have an invisible seam, so on the last row, I just knit half the row and then kitchenered it closed. The kitchner is doing in garter stitch so there's no break to the garter ridges. On the first mitten, I did the ribbing as the book says but then there's a ridge instead where the seam, it's a tiny ridge (about 10 rows, and it's a soft barely-dk weight yarn) but on the second mitten, I did the first & last stitches in garter and the rest in ribbing. When I sewed the mitten closed, the garter stitch seam was flat, no ridge, and it's not really noticeable that instead of K2P2 all the way around, one set of p2 is actually 2 stitches of garter. I don't think it's all that noticeable. I hope. I'm going to make at least one more mitten - "a pair & a spare" set.

Hat -
I haven't decided what kind. I'm thinking of the hat from the same baby set as the mittens. Or maybe a plain hat with an icord knot like this one but without the intarsia designs. I should decide really soon though, the shower's next weekend!


Monday, November 12, 2007

It's here!

My spinning wheel arrived! I'd take a picture, but a cardboard shipping box isn't much to look at.

Project inventory -
I'm almost done with the Garter/Honeycomb Stitch baby sweater from the Greeting from the Knit Cafe book. It's easy enough to make, I'm not sure it's going to be one of my favorites, but that's ok. It's cute and that's pretty much all that matters for a baby sweater!

I finished one of the Magknits Rainbow Socks, and for the first time since I started knitting socks, I haven't started the 2nd sock right away. I'm not sure if it qualifies as Second Sock Syndrome quite yet, I'm chalking it up to "delay by baby sweater" since the baby shower for the Garter/Honeycomb stich sweater is about 6 weeks earlier than I expected it to be.

The baby star afghan is done (did I say that before?) it's about 5' across point to point, which is pretty big for a baby blanket, but babies grow so no problem.

I started sewing a tote bag, and that's a little more than half done. I planned to finish it yesterday, but, didn't happen. Maybe later in the week.

My next to-do is updating the project list on the sidebar.

Thursday, October 11, 2007

Sock progress

Let's see if the picture works -


yippee!!

That's a (not great) picture of the Rainbow Socks done in Regia Linien 5279. It's about 4" so far, so just around 1/2 way up the foot. I'm (mostly) following the pattern - except that I started with a 4-way Swirl Toe from the Ethnic Socks and Stockings book by Priscilla Gibson-Roberts. The short-row sections I'm following the pattern. Haven't decided yet what heel I'll do.

I'm not doing the wrap&turn from the pattern, I like the Japanese short rows instead. And I haven't decided yet if I'll do the p2k2 rib or something else.

And this -



is the start of a baby blanket for my sister-in-law. That's about 7" from point to point. I figure the red/orange/yellow variegated star with a white border is gender-neutral. I'll probably do a quick baby sweater for the baby shower too (I'm guessing she's having it after the baby's born like she did for the first baby. That'll give me a month or so for a baby sweater.)

Thursday, September 13, 2007

Thursday Three

1. The Sweater - I *really* want to get this finished. I finished the sleeves and they're too tight AGAIN. Instead of ripping & reknitting (yet) I'm going to finish the body, and then come back to the sleeves. But I've been thinking about why they're tight. The measurements at the top of the sleeve and the bottom are good - a little less ease than I originally planned for, but um, that's the daily ice-cream cone and chocolate and um, yeah, ok. So why so tight? I did leave the sleeves intentionally short since I haven't decided if I'm doing the ribbing in the same yarn or a contrasting yarn. I've got the right number of decreases - I double checked the calculations and

Oh. oops.

I did the calculations based on the sleeve length. But not the ENTIRE sleeve length, I used the intentionally short sleeve measurment. I did decreases from upper-arm to the wrist measurement with a 3" shorter than true sleeve length. Oh.

So I do need to rip & reknit. Again. After the body's done. I'm tired of sleeves.

And I guess I should cut back on the ice-cream cones, and chocolate, and other assorted goodies.


2.
This week's question
It’s cold and raining, your boyfriend/girlfriend has just dumped you, you’ve just been fired, the pile of unpaid bills is sky-high, your beloved pet has recently died, and you think you’re coming down with a cold. All you want to do (other than hiding under the covers) is to curl up with a good book, something warm and comforting that will make you feel better. What do you read?


Hmmm. I might want something new to focus on instead of how lousy I feel. Or I might want something I've read so much I have practically memorized because I feel too lousy to deal with something new. Or something in between - I've read it before, but not so much that's it's entirely familiar.

Specifics?
Something new - whatever I happen to see at the library or book store. OTOH, if I'm feeling lousy and sick and whatever, I'm not going to be AT that library or book store to look for something to read.

The nearly memorized - Something by Earlene Fowler or Donna Andrews maybe. Or Alice Kimberly. Or some fiber related eye candy from Kaffe Fasset or Brandon Mably etc.

The read-before but not familiar - Gone with the Wind, maybe. Or whatever book I just finished reading. Or anything in the bookshelf that I haven't read recently


3. Preemie hats
I finished one using the Mermaid stitch pattern from Lucy Neatby's book. It's cute, but not too stretchy, I like the preemie hats to be stretchy. I've got a crocheted bonnet almost done. I like this pattern, I use it a lot. I want to try to make it with 2 colors, and I think I figured which stitches to do in each color, but I haven't done it in a color combination I like. That's 2 hats done this month, I have one more to do.

Monday, August 06, 2007

Sweater progress

It’s been 2-3 months since I worked on my version of the Swedish Thora sweater from XRX's Best of Arans & Celtics. I finished a few other things that I had on the needles and now this is the #1 on the guilt-list of unfinished projects. Maybe guilt isn’t the right word, but whatever.

So under the idea that not wanting to knit on this sweater just might be a sign that something is wrong with the project, I took inventory of what’s what knowing full well that I’ll probably end up making big (or not) changes.

Body – It’s knit top down with a modified peasant sleeve from Barbara Walker's book Knitting From The Top Down. It’s done to just below the armholes, the next body row is where the front & back get joined together. Or not. If I don’t join, I’ll have two side seams, but that’s no big deal. I don’t mind sewing up seams and I don’t like circular needles. No problem – do the body in two parts, I just need to remember to add the underarm stitches on the next row.
Sort of related link – a Knitter's Review forum discussing knitting sweaters flat vs in the round


Sleeve 1- Done, but it’s too narrow. I’ll need to rip back the decreases, the top of the sleeve before the decreases started seems to be ok. Small problem – wait for sleeve 2 to be finished so I know what to re-knit.

Sleeve 2 – Started (barely, but 4 rows done is a start) The rows before the decreases start I can just follow the notes I have from sleeve 1. Then I need to recalculate the decreases to finish the sleeve. No problem.

General –In the picture of the Thora sweater is, hmm, elegant, I guess is how I’d describe it. The Cascade 220 purple tweed I’m using is nice, but it’s not an elegant yarn. The finished sweater won’t magically become elegant using the purple tweed. Big problem. The body done so far reminds me of a gansey sweater– the kind with a patterned yoke, a garter stitch band, then a plain stockinette stitch body. That would work with what I’ve got so far. The next few body rows could be the garter stitch band, or another inch or so of the cable & moss stitch before the garter stitch might look better, then a twisted stockinette stitch body. I liked the way the twisted stockinette came out in Stacie's Baby Sweater I bet it would look good in the purple tweed too. Problem solved.

Knitting shall commence!

Other posts about this sweater -
Random Ramblings
Sweater Sleeves
Yarns in Progress

Friday, June 08, 2007

Mindless projects

That's what I've needed - mindless stuff. Between dh's health and some work issues, complicated projects just don't appeal right now. Complicated meaning anything that needs a pattern - so the Gated Vines socks, with an 8-stitch, 12-rwo repeat, is on hold. The Thora sweater with an 8 row cable, purl columns, and moss-stitch background, is on hold. Preemie hats are a possibility, but since I've got a bunch already knit up ready to be donated, I don't feel the 'need' to make more right now. As soon as they're out of the house, then I'll make more. Doesn't make sense, maybe, but there it is.

Spinning? I don't have any 'spin as you want to' spinning, and trying to match what I've spun before is more than I want to deal with right now.

So, I'm still sewing up some of these . I think I've got nearly 3 dozen sewn up. Sewing up layers of rectangles is mindless.

I did finish the 4-Generation Shawl from Spin Off's Spring 2007 issue. 4 skeins of Encore Worsted in the Carribbean color (white with blue & purple specks). It's about 20" from neck to almost-waist. Stays on well too. I may make another one, someday, using a lighter weight yarn. Wonderfully easy pattern!

I just found out a friend of mine is expecting a baby early September. That's got my thinking of making a raglan sweater with a flap-front a la Grumperina They're not going to find out the sex of the baby, but they're using a Jungle theme in the nursery so I'm thinking something in a bright green with animal buttons. Small enough to be done fairly quickly and not too complicated.

Just enough, I think, to ease back into the complicated things in life.

Like knitting lace socks and a cabled sweater.

Thursday, May 03, 2007

Random Ramblings

So I finished one sleeve on the sweater last week and all I've done since then is pick up the stitches for the other sleeve and do maybe 4 rows. At that rate, it'll take oh, I don't know, maybe 5 months for sleeve 2? To be fair though, I think there's two 'problems' with the sweater:

1- what my notes say about how many stitches to pick up, and how many stitches I count on the sleeve 1 don't match. Not by much, 4 or 6 stitches total, about 1/2" worth. I'm going with the number of stitches I counted, and re-calculate the decreases when I get there, just to be sure.

2- the sleeeves are a little bit narrower than I expected. Some of that is blocking, or lack of at this point, but more likely is the 20lbs I gained since starting the sweater last year.

3 - (ok, so there's 3 problems instead of 2, what's one more or less?) distraction and inertia (does that count as 1 or 2 problems?). I got distracting sewing up some of these . Using the sewing machine and I would've been done in a day or two, but I sewed by hand so that took more days. And inertia as in "a body at rest stays at rest" or the knitting equivalent "a project not knitted on yesterday, doesn't get knitted on today" is there too. I need to get this one in gear, I'd like to actually WEAR this someday!

I saw the Summer of Socks a-long and I'm tempted. I'm going to knit socks this summer, so why not? Especially since I've got a sock in progress now anyway. On the other hand, I still haven't finished the spinning/knitting for Twisted Knitters yet and it's a month past deadline. Actually, I finished the spinning, but not the plying. Or the knitting. I might ply it up this weekend.

I didn't join, officially, the Stash Diet but I have been a yarn stash user the last few months. The only yarn I bought the last few months (that I remember anyway....) has been charity yarn, which can be my exception instead of the sock yarn in the 'official' guidelines. I'm not sure why the yarn stash pile doesn't look any smaller though.

I've started crocheting the 4-Generation Shawl from Spin Off's Spring 2007 issue. I've got 4 skeins of Encore Worsted Weight (14 oz or 400 gms) that I'd like to use, it's just a little bit thicker than the yarn used in the magazine and that used about 16oz, so I'm guessing I'll have enough yarn to make a decent sized shawl (23" long or so). It's an interesting shawl, you start out making a 12-sided circle, which does NOT lay flat, then fold it in half - and it DOES lay flat - then work a lace border on the outside edge. The 12 sided circle is about 7" from center to the edge (the center is the neckline), so I've got a bit to go... It works up quickly though.

And I finished crocheting 2 baby bonnets and got a small garter stitch hat started.

Monday, April 23, 2007

Sweater Sleeves

Knit flat and sew? Knit in the round seamless? Knit flat on straights or circs? Knit in the round on dpns or 1 circ or 2 circ? Knit both at once, flat on the needles? Knit both at once on circs? Knit both with steeks between them, cut the steeks and sew the seam?

Seems so simple doesn't it? Two tubes, wider at the top, sewn or otherwise attached to the sweater body, and that's basically it for sleeves.

When I make baby sweaters, I make them seamless preferably top-down since there's usually not a shoulder seam that way, although I've done them bottom-up and sewn up the shoulder. Baby sweater sleeves are almost always seamless. Elizabeth Zimmermann's Baby Surprise Sweater and Surplice Sweater have shoulder seams, but sewn carefully, there's no seam bulk so ok. I did do one top-down baby sweater with flat sleeves with a crocheted slip-stitch seam, easy enough to do, but more bulk than I like for a baby sweater. So, baby sweaters that I make, with few exceptions, are seamless, with sleeves knit in the round on dpns. But then, a baby-sized sweater body is smaller than an adult hat, and sleeves are maybe 30 stitches. Easy to maneuver on dpns.

Adult sweaters, on the other hand, I haven't made many of. Only finished one actually. Well, two, but it was the same sweater - I didn't like how it looked finished, so I ripped it ALL out and re-knit. And it wasn't even for me! That sweater I did completely seamless. The body on circs and the sleeves on dpns. Hated it. Doing the sleeves in the round meant corkscrewed sleeves/sweater and untwisting them every few rows. Turning it clockwise then counterclockwise would've helped, I'm sure, but since I was knitting clockwise turning it counterclockwise after each dpn went 'against the flow' so to speak. Same with the body.

And I don't care what people say, when using circs the weight of the sweater WAS noticeable, it's not laying quietly in your lap. It's pulling on the circs, it's getting twisted from turning the circs as you go around and around. The circ cable twists and kinks even with the sweater weight, and undoing the sweater corkscrew and cable kinks is not pleasurable knitting, even in plain stockinette. (why, no, I don't much like circs, could you tell?)

So, I just finished one sleeve on the Thora sweater I'm making. I did the sleeve flat, on straights (14" Lion Brand) at first, then switched to Clover Jumper Flex needles. At the end of one row I turned clockwise, the next row counterclockwise, so no corkscrewing. The 8-row cable only had 4 rows to keep track off since the 4 wrong side rows were all "knit the knits, purl the purls" it didn't matter if I was on row 3 or row 7, all the ws rows are the same. I just need to track 4 right side rows. Done flat, that's easy. Done in the round, that's 8 rows, in a pattern that for me, is hard to read and tell which 'non-pattern,' aka the wrong side row, I just finished - so row 3 or row 7 DOES matter. Knitting flat simplified the cable for me. I'm sold, adult sweater sleeves, knit flat on jumper needles. At least for sleeves with a cable, maybe I'd feel differently about sleeves with a different pattern. Sewing up a seam is a small, very small, price to pay.

Haven't decided on the body yet. I'm knitting the sweater top down following Barbara Walker's directions for a peasant sleeve with a square armhole.

Monday, April 09, 2007

WIP Inventory

Let's see -

There's my toe-up version of Gated Vines Socks - one sock finished last night, sock #2 has the toe finished. I'm finally knitting on them even without being in the dr's office/waiting room.

There's the Thora sweater - top down, finished to just below the armholes. One sleeve almost done, there's about 30-40 rows left. It got put aside when dh got sick weeks ago. Now it's starting to get too warm to be wearable once it's done. OTOH, if I work on NOW, it'll be done by the time next fall rolls around. What a concept - work on a sweater in the warm weather so it'll be wearable in the cool weather.

There's the BFL and Wensleydale I'm spinning for the Twisted Knitters Spin Knit KAL . I've got about 1/4oz, or maybe a little less, left to spin, that'll take easily 3 hours, then it's got to plied, and knit into a shawl. Or something. I have a pattern in mind, but until I have yarn ready to swatch up and test-knit, the patterns' still tentative. Obviously, I didn't make the 3/31 goal to have a finished project. Oh well.

I knit a Ribbon Slipped Stitch preemie hat that I want to post the pattern for, as soon as I remember to write out the pattern - which I can't do this minute because I don't remember slipped stitch pattern. oy.

There's more UFO's hanging around, but these are the ones that come to mind most often.